Setup location
General surface and slope
Connection method
Screw pile
Tilt angle
5~35 degree
Module direction
Horizontal / vertical
Wind resistance level
38-56.1 m/s
Snow weight resistance
0-150CM
1
The spiral piles are placed into the ground at the sampling points.
2
Fix the pipes and the longitudinal beam in sequence on the screw pile.
3
Then fix the cross beam on the longitudinal beam.
4
The modules are then laid down to complete the installation.
Patent Certification
Among the component patent applications, some of them have obtained invention and new model patents in Taiwan, Japan, and Germany.
Please tell us your thoughts on solar installation and we will make it better.